Our Solutions

Study

Feasibility Study

Initial site visit and evaluation of contamination.
Includes sampling, feasibility overview, and a tailored preliminary decontamination plan.

Quote

Standard Solution

Individual Pricing

Mobile NORM FREE unit deployment with our three-phase cleaning process (ARWS removal, NORM/TENORM release, surface neutralisation & passivation).
Ideal for small to mid-size facilities.

Quote

Custom Solution

Individual Pricing

Tailored engineering, feasibility study, and turnkey NORM FREE technology setup for complex or high-volume operations.
Includes design, manufacturing, deployment, and full operator training.

Quote

Explore Our Innovations


The Only Complete Solution


Basic Assessment The world’s only technology that removes all surface deposits such as paraffins, waxes, resins, minerals, corrosion, and NORM/TENORM contamination in a single work cycle without creating radioactive liquid waste or damaging the cleaning solution.


Safe & Eco-Friendly Waste Handling


Non-radioactive liquid waste (ARWS) can be mixed back into produced crude oil, while solid radioactive waste is insoluble, stable, and immediately ready for safe underground injection or industrial landfill disposal.


Fully Automated & Mobile


A closed, three-phase chemical and hydrodynamic treatment cycle delivers 100% NORM/TENORM removal down to background levels, with up to 95× waste reduction, all from a compact, containerised, self-powered unit deployable onshore or offshore.


Fast, Low-Cost & Turnkey


Quick to assemble, requiring minimal utilities, operators,water, and energy. Delivered turnkey with warranty, 24/7 support, and training, ready for immediate integration into your operations.