Initial site visit and evaluation of contamination.
Includes sampling, feasibility overview, and a tailored preliminary decontamination plan.
Mobile NORM FREE unit deployment with our three-phase cleaning process (ARWS removal, NORM/TENORM release, surface neutralisation & passivation).
Ideal for small to mid-size facilities.
Full-scale decontamination for large industrial assets with advanced chemical treatment and hydrodynamic cleaning.
Delivers 100% NORM/TENORM removal down to natural background levels.
Tailored engineering, feasibility study, and turnkey NORM FREE technology setup for complex or high-volume operations.
Includes design, manufacturing, deployment, and full operator training.
Basic Assessment The world’s only technology that removes all surface deposits such as paraffins, waxes, resins, minerals, corrosion, and NORM/TENORM contamination in a single work cycle without creating radioactive liquid waste or damaging the cleaning solution.
Non-radioactive liquid waste (ARWS) can be mixed back into produced crude oil, while solid radioactive waste is insoluble, stable, and immediately ready for safe underground injection or industrial landfill disposal.
A closed, three-phase chemical and hydrodynamic treatment cycle delivers 100% NORM/TENORM removal down to background levels, with up to 95× waste reduction, all from a compact, containerised, self-powered unit deployable onshore or offshore.
Quick to assemble, requiring minimal utilities, operators,water, and energy. Delivered turnkey with warranty, 24/7 support, and training, ready for immediate integration into your operations.